episode / view more episodes
Finish Work Begins
Tom and Kevin reinstall upper cabinets that survived the fire. HVAC contractor James shows Richard the plan for hot water and heating. Kevin joins Carol and her sister to shop for appliances. Tile installation and window trim.
Donate $40.00 or more to receive this gift as our way of saying "thank you!"
Donate $60.00 or more to receive this gift as our way of saying "thank you!"
Donate $150.00 or more to receive this gift as our way of saying "thank you!"
Donate $365.00 or more to receive this gift as our way of saying "thank you!"